-
Notifications
You must be signed in to change notification settings - Fork 66
Pull requests: openshift/windows-machine-config-operator
Author
Label
Projects
Milestones
Reviews
Assignee
Sort
Pull requests list
WINC-1315: Document steps for EUS-to-EUS upgrade
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
[release-4.16] WINC-1310: Remove certain tests in old upgrade suite
#2218
opened Jun 12, 2024 by
openshift-cherrypick-robot
Loading…
[release-4.13] OCPBUGS-34669: changes needed for validating webhook
jira/valid-bug
Indicates that a referenced Jira bug is valid for the branch this PR is targeting.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2217
opened Jun 12, 2024 by
JacobTanenbaum
Loading…
WINC-1291: Document disconnected
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
WINC-588: Expose metrics over https
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2156
opened May 2, 2024 by
mansikulkarni96
•
Draft
[test] Use -v flag for ssh pods
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
lgtm
Indicates that a PR is ready to be merged.
#2154
opened May 1, 2024 by
sebsoto
Loading…
WINC-1215: Upgrade OperatorSDK to 1.33.0
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
#2108
opened Mar 12, 2024 by
wgahnagl
Loading…
WINC-1199: Fix VM creation automation in new vCenter
approved
Indicates a PR has been approved by an approver from all required OWNERS files.
do-not-merge/hold
Indicates that a PR should not merge because someone has issued a /hold command.
jira/valid-reference
Indicates that this PR references a valid Jira ticket of any type.
lgtm
Indicates that a PR is ready to be merged.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#2027
opened Jan 23, 2024 by
saifshaikh48
Loading…
[hack] Introduce merge-order.sh
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
lifecycle/rotten
Denotes an issue or PR that has aged beyond stale and will be auto-closed.
#1952
opened Nov 16, 2023 by
saifshaikh48
•
Draft
Use operator image to extend must-gather collection with WMCO's specific resources
do-not-merge/work-in-progress
Indicates that a PR should not merge because it is a work in progress.
lifecycle/rotten
Denotes an issue or PR that has aged beyond stale and will be auto-closed.
needs-rebase
Indicates a PR cannot be merged because it has merge conflicts with HEAD.
ProTip!
Add no:assignee to see everything that’s not assigned.